The size, slope, alignment, materials of construction of a building sewer, and the
methods to be used in excavating, placing of the pipe, jointing, testing, and backfilling
of the trench, shall all conform to the requirements of the building and plumbing
code or other applicable rules and regulations of the city. In the absence of code
provisions or in amplification thereof, the materials and procedure set forth in appropriate
specifications of the A.S.T.M. and W.P.C.F. Manual of Practice No. 9 shall apply.
All new or reconstructed private sewer lines shall have underground tracer wire installed
before backfilling.
(Code 1978, § 530.040(F); Ord. No. 03-50, § I, 8-26-2003)
var val = document.getElementById('citecontent').innerHTML;
art.dialog.defaults.title = window.location.href;
art.dialog.data('cite', val);
art.dialog.data('homeDemoPath', '/Scripts/plus/artDialog/');
art.dialog.open('/Scripts/plus/artDialog/citeiframe.html');